182 B
182 B
5.16 — pnpm audit + govulncheck CI gate (GREEN)
Phase: 5 — Chat + Rate Limiter (Surface D) Stage: GREEN
pnpm audit+govulncheckin CI, fail build on high severity
Phase: 5 — Chat + Rate Limiter (Surface D) Stage: GREEN
pnpm audit + govulncheck in CI, fail build on high severity