1.6 KiB
1.6 KiB
atlas — Task Breakdown
Source of truth: docs/PLAN-atlas.md, docs/adr/ADR-0001-atlas-cluster-visualization.md
Supersedes: PLAN.md, IMPLEMENTATION.md (Homarr + Terraform — abandoned)
Status
Not started. 5 decisions block Phase 1 — see 00-decisions.md.
Phases
| File | Phase | Est. |
|---|---|---|
| 00-decisions.md | Blocking decisions (must answer before Phase 1) | — |
| 01-phase0-unblock.md | Phase 0 — unblock deployment | — |
| 02-phase1-atlas-core.md | Phase 1 — atlas core (RBAC, informers, redaction) | ~4d |
| 03-phase2-topology.md | Phase 2 — Surface B: cluster topology | ~3d |
| 04-phase3-delivery.md | Phase 3 — Surface E: delivery tree | ~3d |
| 05-phase4-terminal.md | Phase 4 — Surface C: terminal | ~2d |
| 06-phase5-chat.md | Phase 5 — Surface D: chat + rate limiter | ~5d |
Total: ~17 working days.
Rules carried from the ADR
- I1:
riotpiao.comis the only public hostname, ever - I2: browser never talks to an internal API directly — atlas is the only origin
- I3: redaction is allowlist-only, enforced by DTO construction
- I4: no free-form string reaches an internal system (closed enum, snapshot-membership validation)
- I5: GPU chat concurrency capped at 6 of 8 sequence slots, disconnect cancels upstream immediately
- TDD: RED (tests named before code) → GREEN (minimal code) → REFACTOR, per phase