# T1.3 — Run executor
| Field | Value |
|---|---|
| Phase | P1 — Walking skeleton |
| Size | L — over 3 days |
| Status | Not started |
| Flags | — |
| Spec | inlined below |
| Blocks | — |
## Goal
Drive a hardcoded three-step workflow through the full run lifecycle, emitting
every kernel transition to the log. T3.5 later replaces the hardcoded workflow
with the IR interpreter.
## Facts (inlined — no spec read needed)
Run lifecycle — the states and the legal moves:
```
spawn
v
Scheduled ─────────────────┐
│ admitted │
v │
Running ⇄ Suspended ──────┤
│ all steps terminal │ cancel
v │
Verifying ─────────────────┤ ◄── rests here while verifier
│ │ futures are outstanding
v │
Verified{pass|fail} │
│ │
v v
Grading ──────────────► Cancelled ●
│ ◄── may wait for a tournament group to fill
├──► Graded ● ──┐
│ ├──► Archived ●
└──► Ungraded ● ──┘
```
- **Cancel is reachable from every non-terminal state**, not only `Scheduled`. A
run cancelled mid-step is the ordinary case — it is what a user clicking stop
does. Cancelling during `Verifying` or `Grading` is rarer and still legal.
- **`Verifying` and `Grading` are states the run rests in**, not synchronous
branches. Resolving pass/fail inside `verify()` collapsed this in the prior
implementation and blocked three separate features at once: async verifiers,
mid-run UI, and the snapshot barrier (T4.2).
- **`Ungraded` is terminal and sits beside `Graded`, not below it.** Grading can
legitimately end with no score. Without a terminal state saying so, those runs
rest in `Grading` forever and become permanently irreducible (T4.4).
- `Suspended` releases the worker: a run awaiting human approval or a webhook
must not hold an executor slot across a human decision.
- Concurrency shape: unbounded across runs; **serial** steps within a run;
strictly serial attempts within a step; fan-out only for declared `Parallel`
branches and for verifiers of one attempt. The serial spine is
`(TenantId, RunId)`.
## Steps
1. Define the run-state enum and its transition function, exhaustive like T0.2's.
Include `Cancelled` as reachable from every non-terminal state.
2. Build the executor loop: take the hardcoded three-step workflow, run steps
serially, each step producing one or more attempts (T1.4).
3. Emit a `WorkEvent` for **every** transition through `EventLog::commit` — run
level and attempt level. One commit per transition, not one per run.
4. Enter `Verifying` only when every step is terminal. Park there; do not resolve
verification inline.
5. Enter `Grading` as a resting state likewise; allow it to terminate as
`Graded` **or** `Ungraded`.
6. Run everything inside a `RunScope` (T1.1) so cancel propagates and no task
outlives the run.
7. Add `Suspended` with lease release wired as a no-op stub in embedded mode —
the state must exist now, since T7.3 depends on it.
## Acceptance
- One run completes end to end against the stub model.
- `Verifying` and `Grading` are observable as **distinct states in the log**, not
skipped or collapsed.
## Verify
**Harness:** embedded `redb`, stub model (T1.2), one throwaway verifier, one stub
grader. This is the first test that exercises T0.5, T0.6, T0.8, T1.1 and T1.2
together — treat it as the P1 integration point.
**Integration test**`tests/it_full_run.rs`:
1. Spawn one run of the three-step workflow; drive to completion.
2. Read the log back and assert the **run-state sequence** contains
`Scheduled, Running, Verifying, Grading` and a terminal state, in that order.
Assert `Verifying` and `Grading` each appear as their own record — not
inferred, not skipped.
3. Assert every step produced attempt records and that no state appears out of
order against T0.2's table.
4. Call `assert_refold_identical` on the finished run.
5. Cancel matrix: start a run, cancel it from each of `Scheduled`, `Running`,
`Verifying`, `Grading` in turn; assert each reaches `Cancelled`.
6. Ordering: launch 20 runs concurrently, assert each run's own records are
totally ordered and that no two steps of one run overlap in time.
**Command:** `cargo test -p executor --test it_full_run`
**False pass:**
- Asserting `Verifying` "happened" by checking a boolean on the run record. That
passes against a synchronous `verify()` call, which is the collapse this task
exists to prevent. The **log record** is the assertion.
- A cancel test that only covers `Scheduled`. That is the one case a broken
implementation gets right.
- Step 6 with a single run, where serial execution is indistinguishable from
accidental parallelism.
## Traps
- Making cancel legal only from `Scheduled`. Nobody would ship that lifecycle.
- Treating `Verifying` as a function call. It removes the seam T4.2 needs.
- Interleaving steps within a run "since they look independent". The serial spine
is `(TenantId, RunId)`; parallelism lives between runs and inside declared
fan-out only.
---
Background (not required to do this task):
[rust-agentic-sys.md](../../../rust-agentic-sys.md) §5.2, §5.3 ·
[rust-agentic-task.md](../../../rust-agentic-task.md)