# Handoff Prompt: Implement T0 Milestone Use this prompt with Claude Haiku 4.5 to begin implementation of T0 tasks. --- ## Context You're implementing a Temporal-based multi-agent software orchestrator in Go. The system drives development work on arbitrary target repos using three LLM-backed roles: - **Planner** (reasoning model): reconciles state, dispatches tasks - **Judge** (reasoning model): reviews correctness, runs integration tests - **Implementer** (cheaper model): does actual work, learns from failures All code lives in `/Users/rockliang/workplace/Poimen/workflows/`. ## What's Done - ✅ Full design doc: `/Users/rockliang/.claude/plans/considered-u-are-a-curried-reef.md` - ✅ Project scaffold: `PLAN.md`, `tasks/INDEX.md`, `tasks/board.md` - ✅ Roadmap: T0 (core, 9 tasks) → T1 (hardening) → T2 (scale) → T3 (features) - ✅ Task breakdown: `tasks/T0.1.md` through `tasks/T0.9.md` (each with verification criteria) ## Your Job: Implement T0.1 → T0.9 Start with T0.1 (repo scaffold). Each task: 1. Read its markdown file in `tasks/T0.x.md` 2. Implement the code sketches provided 3. Write unit tests per verification section 4. Run the verification command 5. When it passes, mark `[ ]` → `[x]` in `tasks/board.md` 6. Move to next task ## Key Constraints 1. **No hardcoded values:** All timeouts, retry counts, model IDs come from `OrchestratorConfig.Tuning` or `PromptSpec.Model` (read at runtime). 2. **Activities are independent:** One concern per `action/*.go` file (git, skills, planner, judge, implementer, etc). Testable in isolation. 3. **Testing is verification:** Unit tests via `go.temporal.io/sdk/testsuite` (mocked activities). E2E test (T0.9) against real `temporal.riotpiao.com`. 4. **Go style:** Per `golang-skills` conventions — no naked `_ =`, proper error handling, idiomatic names. 5. **Concurrency safety:** Shared FS with git worktrees + advisory lock. Test concurrent access. ## Implementation Path ``` 1. T0.1: Scaffold directories, go.mod, empty stubs → verify: go build ./... succeeds 2. T0.2: Shared types (ModelSpec, PromptSpec, OrchestratorConfig, etc.) → verify: Unit test asserts all defaults 3. T0.3: Git & locking (CloneRepoActivity, worktrees, squash-merge) → verify: Test against local scratch repo 4. T0.4: Pi & error classification (PrepareSkillsActivity, classifyPiErr) → verify: Unit tests for 4xx/5xx/504 buckets 5. T0.5: LLM agents & prompts (Planner/Judge/Implementer, llm/client.go) → verify: Unit test renders PromptSpec with system prompt 6. T0.6: TaskUnit workflow (retry loops, timeout escalation, lessons) → verify: Testsuite: pass-first-try, fail-then-pass, timeout-escalation 7. T0.7: Orchestrator workflow (config, signals, fan-out/fan-in, continue-as-new, 504 learning) → verify: Testsuite: fan-out/fan-in, squash-merge, signal mutations 8. T0.8: Worker & starter CLIs (cmd/worker, cmd/starter, internal/config) → verify: go build succeeds, go run ./cmd/worker connects to temporal.riotpiao.com 9. T0.9: End-to-end (real cluster + disposable forgejo repo, all 7 checks) → verify: Full cycle with live signals, 5xx retry/exhaust, 504 learning, continue-as-new bounded ``` ## Tools Available - `pi` command: Clone/fetch skills from homelab API - Usage: `pi clone-or-fetch ` - Errors: 4xx (non-retryable), 5xx (retryable), 504 (stream timeout — learn and double timeout) - Temporal Web UI: `http://temporal.riotpiao.com:8080` (monitor workflows) - Forgejo instance: For disposable scratch repos during testing ## Testing Locally Each task has a "Verification" section with a test command. Run it after implementing: ```bash cd /Users/rockliang/workplace/Poimen/workflows go test -v ./tests -run Test ``` For T0.9 (e2e), you'll need: - Real Temporal cluster connection - Anthropic API key (`ANTHROPIC_API_KEY` env) - Forgejo repo access or local git repo ## Commit Message Style ``` T0.x: Brief description Detailed explanation of what was implemented. Verification: ``` Example: ``` T0.2: Implement shared types with defaults Added ModelSpec, PromptSpec, OrchestratorConfig, ActivityTuning, PiRetryPolicy. All defaults documented: 5m ScheduleToCloseTimeout, 2s InitialInterval, 2.0 BackoffCoefficient, etc. Verification: go test ./tests -run TestTypesDefaults passes ``` ## When Stuck 1. Re-read the task markdown in `tasks/T0.x.md` — implementation sketches are concrete 2. Check `PLAN.md` §Design sections for detailed logic (§Timeout Extension, §Pi Command Retry Policy, etc.) 3. Look at the test case in the task markdown — it shows expected behavior 4. If a task depends on prior work, make sure the prior task is complete first ## After T0 Completes When all T0.1–T0.9 pass: ```bash cd /Users/rockliang/workplace/Poimen/workflows git checkout main git merge --squash task/T0.1 task/T0.2 ... task/T0.9 git commit -m "T0: Multi-agent orchestrator initial implementation" git push origin main ``` Then start T1 (or hand off to another assistant). --- **Ready?** Start with `tasks/T0.1.md` and work through in order.