ci: merge test+build+push into single pipeline
CI / test-build-push (pull_request) Failing after 8s

- Single job: vet → test → build binary → build image → push
- Image build/push only on main push (skip on PR)
- Fixed Dockerfile: golang:1.26, build cmd/worker, removed HTTP healthcheck
- Removed separate build-push.yml
This commit is contained in:
Test
2026-09-06 06:12:16 -07:00
parent 7ed0642819
commit bc86fb7242
3 changed files with 42 additions and 71 deletions
+11 -13
View File
@@ -1,22 +1,20 @@
FROM golang:1.21-alpine as builder
FROM golang:1.26-alpine AS builder
WORKDIR /app
COPY go.mod go.sum ./
RUN go mod download
COPY . .
RUN CGO_ENABLED=0 GOOS=linux go build -o workflows ./cmd/poimen/main.go
FROM alpine:latest
# Re-use CI-built binary if present, otherwise build
ARG BINARY_PATH=
RUN if [ -n "$BINARY_PATH" ] && [ -f "$BINARY_PATH" ]; then \
cp "$BINARY_PATH" worker; \
else \
CGO_ENABLED=0 GOOS=linux go build -o worker ./cmd/worker; \
fi
FROM alpine:3.20
RUN apk --no-cache add ca-certificates
WORKDIR /app
COPY --from=builder /app/workflows .
EXPOSE 8080
HEALTHCHECK --interval=10s --timeout=5s --start-period=10s --retries=3 \
CMD wget --no-verbose --tries=1 --spider http://localhost:8080/health || exit 1
ENTRYPOINT ["./workflows"]
COPY --from=builder /app/worker .
ENTRYPOINT ["./worker"]