Commit Graph
1 Commits
Author SHA1 Message Date
Story Crater Bot 4733b89165 docs: implementation roadmap for M3, M4, M5 with detailed breakdown
M3.2 (rerank client):  COMPLETE (5 tests passing)
M3.3 (mem query): Ready, pipeline specified, code structure ready
M3.4 (gate): Blocked on M3.3

M4.1 (skill draft): 60% done (lesson.rs: 871 lines)
M4.2 (cycle-guard): Detailed spec
M4.3 (gate): Blocked on M4.1-4.2

M5.1-5.6 (post-training): Separate Python, M5.4 can run in parallel

Includes:
- Sequential implementation plan (3 weeks)
- Code structure inventory
- Gate progression tracking
- Parallel tracks (M3.5, M3.6, M3.7, M6)
- Acceptance criteria for each task
2026-08-25 11:59:13 -07:00