From 0b0d12c94dd3a392bc8be964fdfb4fce6d14e1b5 Mon Sep 17 00:00:00 2001 From: Story Crater Bot <19826264+Riotpiaole@users.noreply.github.com> Date: Thu, 27 Aug 2026 21:20:28 -0700 Subject: [PATCH] =?UTF-8?q?docs:=20M2=20phase=20notes=20=E2=80=94=20M2.1-2?= =?UTF-8?q?.6=20archived,=20only=20M2.7-8=20remain?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit Updated INDEX.md to clarify M2.x status: ✅ M2.1-2.6 complete and archived (7 tasks → 0 active files) ⬜ M2.7 active (edge closure verification) ⬜ M2.8 gate pending M2.7 Total task files in /tasks/: 47 (all active/in-progress/not-started) Source of truth: INDEX.md for completion status --- tasks/INDEX.md | 18 ++++++++++-------- 1 file changed, 10 insertions(+), 8 deletions(-) diff --git a/tasks/INDEX.md b/tasks/INDEX.md index fe48ef7..8c71fea 100644 --- a/tasks/INDEX.md +++ b/tasks/INDEX.md @@ -97,15 +97,17 @@ Completed and archived: **M0.x (8/8)**, **M1.x (8/8)** — all task files delete ## 3 — Projections · M2.x -**Status:** In progress · 6/8 done, 2 pending (M2.7, M2.8 gate). +**Status:** In progress · 6/8 done, 2 pending (M2.7, M2.8 gate). Task files for M2.1-2.6 archived. -M2.1 ✅ (embeddings client: 768-dim batching @32) -M2.2 ✅ (CNPG Cluster + Database CRD with pgvector 0.7.0) -M2.3 ✅ (schema + sqlx migrations — M2.3 spec tables, 5 entity types) -M2.4 ✅ (pgvector repository: upsert, search, edges, lookup_signature, 8 tests) -M2.5 ✅ (obsidian projector: deterministic vault, frontmatter, provenance, 10 tests) -M2.6 ✅ (rebuild from log: orchestration, two-pass node/edge, vault sync, cache, 6 tests) -M2.7 ⬜ (verify edges — edge closure proof) +M2.1-2.6 ✅ ARCHIVED: (embeddings, CNPG, schema, pgvector repo, obsidian projector, rebuild orchestrator) +- M2.1 ✅ (embeddings client: 768-dim batching @32) +- M2.2 ✅ (CNPG Cluster + Database CRD with pgvector 0.7.0) +- M2.3 ✅ (schema + sqlx migrations — M2.3 spec tables, 5 entity types) +- M2.4 ✅ (pgvector repository: upsert, search, edges, lookup_signature, 8 tests) +- M2.5 ✅ (obsidian projector: deterministic vault, frontmatter, provenance, 10 tests) +- M2.6 ✅ (rebuild from log: orchestration, two-pass node/edge, vault sync, cache, 6 tests) + +M2.7 ⬜ (verify edges — edge closure proof) — active task file M2.8 gate awaits M2.7. ## 4 — L2 synthesis and retrieval · M3.x