fix(forgejo): resolve merge conflict — keep 60Gi, revert CPU to 1000m
This commit is contained in:
@@ -161,9 +161,9 @@ ingress:
|
||||
# The database was never the bottleneck. A real action_runner UPDATE measured
|
||||
# 2.133ms with zero lock waits, so this is CPU starvation in Gitea itself.
|
||||
#
|
||||
# requests.cpu rises to 750m because a request below real usage earns the pod
|
||||
# little scheduling weight during contention. limits.cpu rises to 3000m
|
||||
# because diff computation is bursty and needs room to run without throttling.
|
||||
# requests.cpu stays 200m and limits.cpu stays 1000m. The 3000m limit was a
|
||||
# temporary measure while the Actions stall was diagnosed; the real fix landed
|
||||
# elsewhere, so the limit is back to the original.
|
||||
#
|
||||
# Caution: this pod runs on talos-cp-3, a control-plane node. If Gitea
|
||||
# throttles again at 1000m, move the workload off the control plane rather
|
||||
|
||||